MALAYSIA, Bario Asal and Arur Layun, Sarawak, Borneo – June 2007
Community-based micro-hydro power in exchange for the creation of a permanent 1,483-acre rainforest preserve

Loading microhydro equipment onto a plane The turbine Generator operators View of the community
Click photo to enlarge

The adjoining villages of Bario Asal and Arur Layun are located in the Bario Highlands plane of Sarawak. The indigenous Kelabit people are mainly wet rice paddy farmers; the water used in irrigating their fields comes from small streams that run close to their longhouses. Bario is located in the heart of Borneo, and there are few signs of modern development; electricity comes from private or village-owned diesel generators. Micro-hydro energy systems harness energy by using the vertical drop of a stream.  Seacology has supported the Borneo Project and PACOS Trust by funding two such micro-hydro systems in Borneo (Long Lawen and Terian). The communities of Bario Asal and Arur Layan are requesting funding for a micro-hydro system providing up to 40 kilowatts of renewable electricity for 50 households, a primary school, secondary school, church, community hall, sundry shops, agro-processing mill, and welding and planning workshops. PACOS Trust will provide training in micro-hydro design, installation, management and maintenance, as well as socio-economic development training. In return, the communities will establish a 1,483-acre rainforest preserve. The community will plant 1,000 fruit and timber tree seedlings in deforested areas within the watershed and along the river banks with the intention of returning the watershed to its original state. *

UPDATE May 2008 - The project began in February 2008 after all funding was procured. By April 2008 the project was 80% completed in spite of some challenges getting materials transported to the site. The project leaders anticipate that the construction of the system will be finalized at the end of May 2008.

UPDATE January 2009 - As of August 2008 the project experienced a significant delay due to rising transportation costs, causing all shipments within Malaysia to only ship emergency equipment first before less urgent shipments. In spite of this set-back by November 2008 most materials were transported to the site and construction resumed. The project leaders anticipate that the construction of the system will be finalized in mid-2009.

UPDATE June 2009 - As of April 2009 the project is complete. In January 2009 the installation, testing and commissioning of the turbine was completed. The communities held a simple ceremony in March to mark this historic occasion.

UPDATE November 2009 - As of November 2009 the project coordinator reports that the system has been running well without any serious problems. There was a short interruption in operations in June due to a long drought that forced the system to run only 12 hrs a day for 2 weeks; 24 hour operations resumed in July after the rains came. Since its commissioning the micro-hydro system has replaced 7 diesel generators in the community and displaced the use about 6,000 liters of fossil fuels. The micro-hydro system has saved the community approximately RM 13,200 (USD 4,000) from the fuel cost. Additionally, the community has begun watershed rehabilitation and have planted about 1,000 seedlings so far. This process will continue as there are still areas within the watershed area that need replanting. There has been lot of local interest in replicating this system in other rural communities in Sabah and Sarawak, however there are not yet any concrete policies by the government to adopt this model.

UPDATE June 2010 - As of June 2010 the project contact reports that since its commissioning the micro hydro system has been working well with only another minor disruption due to drought earlier this year (Feb-March). In December 2009 the community, in collaboration with Sarawak Forestry, conducted tree planting through funds from ITTO. The program has successfully planted about 2,000 seedlings from a variety of local tree species. Rehabilitation of the areas damaged during the construction was also done.

Back to Top

*Support for asterisked projects is provided fully or in part by: Nu Skin Force For Good Foundation

bottom of page bar

Contact Us || Search || Site Map || Privacy Policy

© 1999-2010 Seacology. All Rights Reserved.

Link to Secure Online Donation Form